logo

SR 107/SR 112 FROM I-75 TO 0.24 MI W OF CR 181/THOMPSON ROAD

Sector: Car parking • Location: Ashburn, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project proposes to widen SR 107/SR 112 eastward just inside the eastern city limit of the City of Ashburn, beginning at the I-75 northbound ramps to just west of CR 181/Thompson Road. The project length is approximately 0.7 mile. The proposed typical section would consist of four 12 ft. travel lanes (two in each direction) with a 14 ft. flush median and 16 ft. urban shoulders with sid

Project Information FAQ

Project Information

4 Q
The project “SR 107/SR 112 FROM I-75 TO 0.24 MI W OF CR 181/THOMPSON ROAD” is an infrastructure initiative in the Car parking sector, located in Ashburn, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project proposes to widen SR 107/SR 112 eastward just inside the eastern city limit of the City of Ashburn, beginning at the I-75 northbound ramps to just west of CR 181/Thompson Road. The project length is approximately 0.7 mile. The proposed typical section would consist of four 12 ft. travel lanes (two in each direction) with a 14 ft. flush median and 16 ft. urban shoulders with sidewalks. The required ROW is approximately 150 ft. for the western portion of the project, and approximately 225 ft. for the eastern portion of the project to provide for the protective buying for the future widening project PI 0014892. The additional lanes will be added/ dropped at the I-75 northbound ramps and tapered at the project end. Also, existing cross drains will be replaced as needed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data