SR 10/SR 17 FM SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA
Sector: Bridge • Location: Washington, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Project No. EDS00-0545-00(053) consists of widening SR 10/SR 17/US 78/Thomson Road and shifting new alignment to new location from approximately 0.36 mile north of CR 6/Smith Mill Rd. to the southern end of the Washington Bypass for a distance of approximately 9.7 miles. The widening would begin on the western side of the existing SR 10/SR 17/US 78 (Thomson Road), using a typical section of four
- Status
- Closed
- Sector
- Bridge, Road
- Location
- Washington, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 10/SR 17 FM SMITH MILL RD TO WASHINGTON BYP/WILKES - TIA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project No. EDS00-0545-00(053) consists of widening SR 10/SR 17/US 78/Thomson Road and shifting new alignment to new location from approximately 0.36 mile north of CR 6/Smith Mill Rd. to the southern end of the Washington Bypass for a distance of approximately 9.7 miles. The widening would begin on the western side of the existing SR 10/SR 17/US 78 (Thomson Road), using a typical section of four 12-foot lanes with a 44-foot grassed depressed median and 10-foot shoulders (with 6.5 feet paved) from north of CR 6/Smith Mill Rd. to a point approximately 1.7 miles north of Little River. The widening would continue west with a 14-foot flush median and extend to the project terminus at the Washington Bypass. At the Little River, two new bridges each 300 feet long and 38 feet wide would be constructed. A deceleration lane would be added at the entrance to the boat ramp and the driveway widened to 24 feet. Required ROW varies from 150 to 250 feet. The design speed is 65 mph. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Washington |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
