SR 11 FM CS 654/MARABLE ST TO .08 MI N OF CS 730/MAYFIELD DR

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project is located completely within the City of Monroe. The project will construct new or expanded sidewalks and new bicycle facilities along both sides of the North Broad Street (SR 11) from Marable Street to US 78. The pavement will be re-striped to allow for bicycle lanes and wider sidewalks. In addition, these improvements would install raised curbs, defined pedestrian crossings at inters

Status
Closed
Sector
Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Manufacturing (Industrial)
Location
Monroe, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 11 FM CS 654/MARABLE ST TO .08 MI N OF CS 730/MAYFIELD DR

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 11 FM CS 654/MARABLE ST TO .08 MI N OF CS 730/MAYFIELD DR” is an infrastructure initiative in the Water Supply and Storage sector, located in Monroe, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is located completely within the City of Monroe. The project will construct new or expanded sidewalks and new bicycle facilities along both sides of the North Broad Street (SR 11) from Marable Street to US 78. The pavement will be re-striped to allow for bicycle lanes and wider sidewalks. In addition, these improvements would install raised curbs, defined pedestrian crossings at intersections, a mid-block pedestrian crossing between Tyler Street and GW Carver Drive, shared lane and dedicated bicycle lane markings, street trees and landscaping, pedestrian scale lighting and other street furnishings, ADA-accessible curb ramps and storm sewer upgrades. The project has a total project length of 0.59 miles.

Location

Country

United States of America (USA)

State

Georgia

City

Monroe

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Manufacturing (Industrial)

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project