SR 11 FM CS 654/MARABLE ST TO .08 MI N OF CS 730/MAYFIELD DR
Sector: Water Supply and Storage • Location: Monroe, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project is located completely within the City of Monroe. The project will construct new or expanded sidewalks and new bicycle facilities along both sides of the North Broad Street (SR 11) from Marable Street to US 78. The pavement will be re-striped to allow for bicycle lanes and wider sidewalks. In addition, these improvements would install raised curbs, defined pedestrian crossings at inters
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Car parking, Road, Automotive
- Location
- Monroe, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 11 FM CS 654/MARABLE ST TO .08 MI N OF CS 730/MAYFIELD DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located completely within the City of Monroe. The project will construct new or expanded sidewalks and new bicycle facilities along both sides of the North Broad Street (SR 11) from Marable Street to US 78. The pavement will be re-striped to allow for bicycle lanes and wider sidewalks. In addition, these improvements would install raised curbs, defined pedestrian crossings at intersections, a mid-block pedestrian crossing between Tyler Street and GW Carver Drive, shared lane and dedicated bicycle lane markings, street trees and landscaping, pedestrian scale lighting and other street furnishings, ADA-accessible curb ramps and storm sewer upgrades. The project has a total project length of 0.59 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Monroe |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Car parking, Road, Automotive |
Article published date | 2026-03-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
