logo

SR 112 FROM SR 7/US 41 TO CS 503/JOHNSON STREET

Sector: Water Supply and Storage • Location: Ashburn, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Ashburn Pedestrian Facilities - Phase3:

Ashburn Pedestrian Facilities - Phase3: The proposed project consists of sidewalk, pedestrian lighting, landscaping, and irrigation improvements along SR 112/East Washington Avenue from the intersection of US 41/SR 7, east two blocks (0.20 miles) to the intersection of Johnson Street. The project is Phase Ill of Streetscape Improvements

Project Information FAQ

Project Information

4 Q
The project “SR 112 FROM SR 7/US 41 TO CS 503/JOHNSON STREET” is an infrastructure initiative in the Water Supply and Storage sector, located in Ashburn, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ashburn Pedestrian Facilities - Phase3: Ashburn Pedestrian Facilities - Phase3: The proposed project consists of sidewalk, pedestrian lighting, landscaping, and irrigation improvements along SR 112/East Washington Avenue from the intersection of US 41/SR 7, east two blocks (0.20 miles) to the intersection of Johnson Street. The project is Phase Ill of Streetscape Improvements in Ashburn. The existing sidewalks will be removed and replaced within the same footprint. Proposed improvements include the installation of 1,600 linear feet of 30"" curb and gutter, 8 foot wide stamped concrete sidewalks with 2 foot broom finished concrete strip approximately 800 linear feet on each side of the street, new pedestrian lighting with breakaway design, and landscaping to match the previously completed Phase 1.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data