logo
ProjectUnder Construction

SR 116 Box Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: 3B Media News

SR 116 is reduced to one lane controlled by a temporary traffic signal through the box bridge replacement project over Stockstill Creek.

Status
Under Construction
Sector
Road, Bridge
Location
Tennessee, United States of America
Updated
22 Jul 2026
Source
3B Media News

ConstructChat

Ask ConstructChat about SR 116 Box Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 116 Box Bridge Replacement” is an infrastructure initiative in the Road sector, located in Tennessee, United States. Taiyo aggregates data on it from 3B Media News.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SR 116 is reduced to one lane controlled by a temporary traffic signal through the box bridge replacement project over Stockstill Creek.

Location

Country

United States of America (USA)

State

Tennessee

Source

Source

3B Media News

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project