logo

SR 119 FROM SR 38/US 84 TO SR 196 IN HINESVILLE

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Project STP-0004-00(917) consists of the widening of SR 119 in Liberty County. The project proposes to widen SR 119 from the intersection of US 84 to SR 196 on 200 feet of proposed right of way. SR 119 would be widened from an existing 2 lane facility to a 4 lane divided roadway. The southern terminus is the intersection of SR 119 and US 84. Within the projec t area, SR 119 is func tionally c l

Project Information FAQ

Project Information

4 Q
The project “SR 119 FROM SR 38/US 84 TO SR 196 IN HINESVILLE” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project STP-0004-00(917) consists of the widening of SR 119 in Liberty County. The project proposes to widen SR 119 from the intersection of US 84 to SR 196 on 200 feet of proposed right of way. SR 119 would be widened from an existing 2 lane facility to a 4 lane divided roadway. The southern terminus is the intersection of SR 119 and US 84. Within the projec t area, SR 119 is func tionally c lassified as a minor urban arterial. The length of the proposed project is approximately 3.30 miles. The typical section will consist of two - 12 foot lanes in each direction with a 24 foot raised grassed median. There will be a 1 7 foot outside shoulder with 2.5 feet of curb & gutter and a multi-use pathway on the west side. The east side shoulder will c onsist of 2.5 feet of curb & gutter and a 6 foot sidewalk for a total width of 13 foot.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data