SR 11BU/SR 60 FROM CS 624/ACADEMY ST TO CS 548/GLENWOOD DR
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
This project is located in the City of Gainesville, Hall County. The project begins north of the intersection of SR 11/Green Street and Academy Street, at the northern limit if the proposed roundabout to be built as part of P.I. No. 0015918. The project extends north and ends at the intersection of SR 60/Green Street NE and Glenwood Drive. This project aims to enhance safety and mobility for vehi
- Status
- Under Construction
- Sector
- Automotive, Road, Car parking, Power Transmission, Power Generation (CCGT), Government, Waste Processing and Treatment
- Location
- Gainesville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 11BU/SR 60 FROM CS 624/ACADEMY ST TO CS 548/GLENWOOD DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is located in the City of Gainesville, Hall County. The project begins north of the intersection of SR 11/Green Street and Academy Street, at the northern limit if the proposed roundabout to be built as part of P.I. No. 0015918. The project extends north and ends at the intersection of SR 60/Green Street NE and Glenwood Drive. This project aims to enhance safety and mobility for vehicles along the corridor while addressing the need for improved drainage and pedestrian accessibility, all while maintaining and enhancing the historic context of the corridor. The improvements on Green Street will include full-depth pavement replacement throughout much of the corridor. A 2 ft landscape/hardscape strip, 6 ft sidewalk and 2 ft utility shoulder to accommodate utilities and pedestrian lighting. The roadway’s cross slope will be inverted toward a raised median, with the primarily drainage system running along the center of the road and within the raised median. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Gainesville |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Road, Car parking, Power Transmission, Power Generation (CCGT), Government, Waste Processing and Treatment |
Article published date | 2025-08-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
