logo

SR 11BU/SR 60 FROM CS 624/ACADEMY ST TO CS 548/GLENWOOD DR

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project is located in the City of Gainesville, Hall County. The project begins north of the intersection of SR 11/Green Street and Academy Street, at the northern limit if the proposed roundabout to be built as part of P.I. No. 0015918. The project extends north and ends at the intersection of SR 60/Green Street NE and Glenwood Drive. This project aims to enhance safety and mobility for vehi

Status
Under Construction
Sector
Automotive, Road, Car parking, Power Transmission, Power Generation (CCGT), Government, Waste Processing and Treatment
Location
Gainesville, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 11BU/SR 60 FROM CS 624/ACADEMY ST TO CS 548/GLENWOOD DR

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 11BU/SR 60 FROM CS 624/ACADEMY ST TO CS 548/GLENWOOD DR” is an infrastructure initiative in the Automotive sector, located in Gainesville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is located in the City of Gainesville, Hall County. The project begins north of the intersection of SR 11/Green Street and Academy Street, at the northern limit if the proposed roundabout to be built as part of P.I. No. 0015918. The project extends north and ends at the intersection of SR 60/Green Street NE and Glenwood Drive. This project aims to enhance safety and mobility for vehicles along the corridor while addressing the need for improved drainage and pedestrian accessibility, all while maintaining and enhancing the historic context of the corridor. The improvements on Green Street will include full-depth pavement replacement throughout much of the corridor. A 2 ft landscape/hardscape strip, 6 ft sidewalk and 2 ft utility shoulder to accommodate utilities and pedestrian lighting. The roadway’s cross slope will be inverted toward a raised median, with the primarily drainage system running along the center of the road and within the raised median.

Location

Country

United States of America (USA)

State

Georgia

City

Gainesville

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Automotive, Road, Car parking, Power Transmission, Power Generation (CCGT), Government, Waste Processing and Treatment

Article published date

2025-08-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project