logo

SR 120 FROM BOLES ROAD TO RIVER MILL DRIVE

Sector: Road • Location: Duluth, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project was originally programmed to widen State Route (SR) 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two to four through lanes. The total project length is approximately 2.7 miles, which includes a 1500’ tie-in to SR 120 west of SR 141 and a 1000’ tie-in east of Peachtree Industrial Boulevard. Both SR 141 and Peachtree Industrial Boulevard

Status
Under Construction
Sector
Road, Bridge, Manufacturing (Industrial), Government
Location
Duluth, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 120 FROM BOLES ROAD TO RIVER MILL DRIVE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 120 FROM BOLES ROAD TO RIVER MILL DRIVE” is an infrastructure initiative in the Road sector, located in Duluth, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project was originally programmed to widen State Route (SR) 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two to four through lanes. The total project length is approximately 2.7 miles, which includes a 1500’ tie-in to SR 120 west of SR 141 and a 1000’ tie-in east of Peachtree Industrial Boulevard. Both SR 141 and Peachtree Industrial Boulevard would be improved and widened for approximately 1000’ in each direction approaching SR 120. Parsons Road would also be improved and widened to 1250’ south of SR 120, and Boles Road would be improved to 1000’ north of SR 120. All other side roads would be improved to a maximum of 500’ from SR 120. The existing SR 120 bridge would be widened and/or reconstructed across the Chattahoochee River. All signalized intersections would be modified

Location

Country

United States of America (USA)

State

Georgia

City

Duluth

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge, Manufacturing (Industrial), Government

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project