logo

SR 120 FROM SR 141/FULTON TO PEACHTREE IND BLVD/GWINNETT

Sector: Bridge • Location: Duluth, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project would widen State Route (SR) 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two to four through lanes.The total project length is approximately 2.5 miles, which includes a 1500’ tie-in to SR 120 west of SR 141 and a 1000’ tie-in east of Peachtree Industrial Boulevard. Both SR 141 and Peachtree Industrial Boulevard would be improv

Project Information FAQ

Project Information

4 Q
The project “SR 120 FROM SR 141/FULTON TO PEACHTREE IND BLVD/GWINNETT” is an infrastructure initiative in the Bridge sector, located in Duluth, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project would widen State Route (SR) 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to Peachtree Industrial Boulevard from two to four through lanes.The total project length is approximately 2.5 miles, which includes a 1500’ tie-in to SR 120 west of SR 141 and a 1000’ tie-in east of Peachtree Industrial Boulevard. Both SR 141 and Peachtree Industrial Boulevard would be improved and widened for approximately 1000’ in each direction approaching SR 120. Parsons Road would also be improved and widened for 1250’ south of SR 120, and Boles Road would be improved for 1000’ north of SR 120. All other side roads would be improved to a maximum of 500’ from SR 120. The existing SR 120 bridge would be widened and/or reconstructed across the Chattahoochee River. All signalized intersections would be modified. Existing ROW within the project corridor are approximately 60 to 130 feet. Proposed ROW would be approximately 104 to 140 feet.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data