SR 121/US 25 FM CR 438/BURKE CO TO SR 88 IN RICHMOND CO
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
EDS-565(9) consists of a four lane divided section (two 12 ft lanes in each direction of travel separated by a 44-ft. wide grassed median). From County Road 438, US 25/SR 121 would be widened on the west side and continue to 0.2 mile past County Road 23/Four Points Road. The widening would then shift to the east side and continue on the east side until reaching County Road 26/Griener Circle. Fr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | EDS-565(9) consists of a four lane divided section (two 12 ft lanes in each direction of travel separated by a 44-ft. wide grassed median). From County Road 438, US 25/SR 121 would be widened on the west side and continue to 0.2 mile past County Road 23/Four Points Road. The widening would then shift to the east side and continue on the east side until reaching County Road 26/Griener Circle. From County Road 26/griener Circle the alignment would shift west side of US 57/Minns Road the alignment would be on mew location adjacent over McBean Creek. The existing road way within this section is substandard. The proposed right-of-way along this section would be 250 feet which includes 100 feet of existing right-of-way along US 25/SR 121. The widening would then shift to the east side and continue on the east side until reaching State Route 88. County Route 26/ Allen Road (East of US 25) would be relocated 800 feet south of its present location to intersect US 25/SR 121 at CR381. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
