logo

SR 13 FM CS 8/AFTON LANE TO CS 750/SHALLOWFORD TERRACE-PH II

Sector: Car parking • Location: Chamblee, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The improvements to occur along the corridor include: upgrading existing or adding new sidewalk and retrofitting the existing driveway aprons, adding a raised median from Afton Lane to Clairmont Terrace and adding pedestrian refuge islands, upgrading handicap ramps to meet ADA standards, and adding pedestrian lighting. In areas where sidewalk doesn't currently exist or is in bad condition, 5' side

Project Information FAQ

Project Information

4 Q
The project “SR 13 FM CS 8/AFTON LANE TO CS 750/SHALLOWFORD TERRACE-PH II” is an infrastructure initiative in the Car parking sector, located in Chamblee, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The improvements to occur along the corridor include: upgrading existing or adding new sidewalk and retrofitting the existing driveway aprons, adding a raised median from Afton Lane to Clairmont Terrace and adding pedestrian refuge islands, upgrading handicap ramps to meet ADA standards, and adding pedestrian lighting. In areas where sidewalk doesn't currently exist or is in bad condition, 5' sidewalks will be constructed. A 2' stamped concrete strip will be added between the curb and sidewalk where possible to move pedestrians further away from the traveled way. Header curb or curb and gutter will be replaced where necessary throughout the project. Existing drainage structures will be retained or raised wherever possible throughout the corridor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data