logo

SR 133 FROM 0.25 MI N OF MIKE HORNE RD TO N OF WORTH CO LINE

Under construction · Georgia

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project begins approx. 1300 ft north of CR 187/Mike Horne Rd at MP 25.7 & continues to just north of the Colquitt/Worth County Line at MP 30.9 for a total length of 5.1 miles. The beginning of the project transitions SR 133 from a 32’ depressed median to a 5-lane with 14’ flush median roadway with a design speed of 45 mph. As SR 133 approaches the City of Doerun, the design speed will reduce

Status
Under Construction
Sector
Road
Location
Doerun, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 133 FROM 0.25 MI N OF MIKE HORNE RD TO N OF WORTH CO LINE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 133 FROM 0.25 MI N OF MIKE HORNE RD TO N OF WORTH CO LINE” is an infrastructure initiative in the Road sector, located in Doerun, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project begins approx. 1300 ft north of CR 187/Mike Horne Rd at MP 25.7 & continues to just north of the Colquitt/Worth County Line at MP 30.9 for a total length of 5.1 miles. The beginning of the project transitions SR 133 from a 32’ depressed median to a 5-lane with 14’ flush median roadway with a design speed of 45 mph. As SR 133 approaches the City of Doerun, the design speed will reduce to 35 mph & the 5-lane section will transition to a one-way pair with two lanes each direction beginning at SR 270/E Broad Ave just south of S Fain Street & transitioning back to 5-lanes with a 14’ flush median at realigned SR 270 just north of Ticknor Rd. The 5-lane section would then transition back to a 32' depressed median to tie in to PI0000519 just north of the Colquitt/Worth County Line with the design speed increasing to 65 mph.

Location

Country

United States of America (USA)

State

Georgia

City

Doerun

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project