SR 138 @ SR 155
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
This project is being constructed to improve the safety and operation of the SR 138 at SR 155 intersection. This project consists of widening all four approaches to the intersection to facilitate the addition of exclusive left and right turn lanes on all approaches. A stop and go signal will also be install. The total length of the project is 0.30 miles.
- Status
- Closed
- Sector
- Road, Manufacturing (Industrial), Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 138 @ SR 155
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is being constructed to improve the safety and operation of the SR 138 at SR 155 intersection. This project consists of widening all four approaches to the intersection to facilitate the addition of exclusive left and right turn lanes on all approaches. A stop and go signal will also be install. The total length of the project is 0.30 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial), Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
