logo

SR 138 FROM E OF ALMAND CREEK TO E OF AMHERST LANE

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The 0.3-mile project provides a westbound left turn lane to Amherst Lane by widening SR 138 asymmetrically to the north of its current alignment. The widening would begin just east of the existing triple 8x8 box culvert at Almand Creek, and would taper out over 600-ft to provide a 12-ft left turn lane at the intersection of SR 138 and Amherst Lane. Storage for the left turn lane would measure 285-

Project Information FAQ

Project Information

4 Q
The project “SR 138 FROM E OF ALMAND CREEK TO E OF AMHERST LANE” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 0.3-mile project provides a westbound left turn lane to Amherst Lane by widening SR 138 asymmetrically to the north of its current alignment. The widening would begin just east of the existing triple 8x8 box culvert at Almand Creek, and would taper out over 600-ft to provide a 12-ft left turn lane at the intersection of SR 138 and Amherst Lane. Storage for the left turn lane would measure 285-ft of full width. The widening will taper down approximately 600-ft to match the existing pavement width. Existing mountable curb will be retained along eastbound SR 138 adjacent to the existing right turn lane, and after the intersection of SR 138 and Amherst Lane. All existing pavement within the project limits will be milled and inlayed. No improvements are proposed along Amherst Lane.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data