SR 15; ADAMS & 4TH FM GILWOOD ST TO S OF E SOUTH CENTRAL AVE
Sector: Car parking • Location: Tennille, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The City of Tennille is a project 0.76 miles (4,012.8 feet) 12-foot wide shared-use path and a trailhead with up to ten parking spots, benches, signage, bike racks, bike repair stations, landscaping, and lighting. 20 construction easements are possible. Utility pole relocation is possible. Two pedestrian bridges.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction work program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The City of Tennille is a project 0.76 miles (4,012.8 feet) 12-foot wide shared-use path and a trailhead with up to ten parking spots, benches, signage, bike racks, bike repair stations, landscaping, and lighting. 20 construction easements are possible. Utility pole relocation is possible. Two pedestrian bridges. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
