SR 16 and SR 302 (SPUR) Purdy Creek - Remove Fish Barriers and Paving
Sector: Bridge • Location: Washington, United States of America
Source: Washington State Department of Transportation (WSDOT)
This project improves habitat and passage for fish in Purdy Creek under State Route 16 and the SR 302 Spur.
Purdy Creek attempts to flow under SR 16 inside a 40-year-old culvert. Many fish species cannot swim through the old culvert. This project will replace the culvert with two 206-foot-long bridge structures. The Washington Department of Fish and Wildlife estimates this work will create abo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project improves habitat and passage for fish in Purdy Creek under State Route 16 and the SR 302 Spur. Purdy Creek attempts to flow under SR 16 inside a 40-year-old culvert. Many fish species cannot swim through the old culvert. This project will replace the culvert with two 206-foot-long bridge structures. The Washington Department of Fish and Wildlife estimates this work will create about 5.6 miles of new habitat. Purdy Creek is home to juvenile Chinook, coho and chum salmon. Adult and juvenile steelhead, coastal cutthroat trout and sculpin are also found in the creek. Purdy Creek also runs under the SR 302 Spur through an old culvert before it enters the tidal flats of the Burley Lagoon. The culvert is challenging for fish to navigate. During summer 2023, crews filled in the old culvert and started building a 77-foot-long bridge structure. WDFW estimates this work will open a total of 6.5 miles of habitat. This work will help preserve the integrity of the highways and reduce maintenance costs by reducing or eliminating the possibility of culvert blockages. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
