logo
ProjectUnder Construction

SR 162 Pellissippi Parkway Bridge Work

The status, timeline and source of this project. A free account opens every field.

Source: 3B Media News

Bridge work on SR 162 Pellissippi Parkway between Cusick Road and SR 33 with lane reduction and possible brief rolling roadblocks for blasting operations.

Status
Under Construction
Sector
Bridge, Road
Location
Tennessee, United States of America
Updated
22 Jul 2026
Source
3B Media News

ConstructChat

Ask ConstructChat about SR 162 Pellissippi Parkway Bridge Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 162 Pellissippi Parkway Bridge Work” is an infrastructure initiative in the Bridge sector, located in Tennessee, United States. Taiyo aggregates data on it from 3B Media News.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge work on SR 162 Pellissippi Parkway between Cusick Road and SR 33 with lane reduction and possible brief rolling roadblocks for blasting operations.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Tennessee

Source

Source

3B Media News

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-05-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project