SR 163 Sediment Basin Improvements - Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Work to be performed under this Contract is for the construction of a sediment control facility in Laughlin, Nevada. The Work will generally consist of flood control improvements consisting of excavation of a sediment basin, energy dissipation devices, concrete channel lining, storm drain facilities, and maintenance access; traffic control, dust control, and storm water pollution control; appu
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SR 163 Sediment Basin Improvements - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to be performed under this Contract is for the construction of a sediment control facility in Laughlin, Nevada. The Work will generally consist of flood control improvements consisting of excavation of a sediment basin, energy dissipation devices, concrete channel lining, storm drain facilities, and maintenance access; traffic control, dust control, and storm water pollution control; appurtenances and miscellaneous improvements as shown on the drawings; and other related items of wor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
