logo

SR 17 FM SE CR 67/ROSS PL N LAVONIA TO SE STEPHENS CL&BR

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Project EDS-IM-545(19) proposes to widen and reconstruct a portion of SR 17 in Franklin County. The project begins on SR 17 approx. 0.40 miles southeast of the northbound I-85 ramps. The proposed roadway consists of 4-12 ft. lanes divided by a 20 ft. raised median that extends for approx. 0.80 miles crossing I-85. The typical section then transitions to a 4-12 ft. lanes divided by a 14 ft. flus

Project Information FAQ

Project Information

4 Q
The project “SR 17 FM SE CR 67/ROSS PL N LAVONIA TO SE STEPHENS CL&BR” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project EDS-IM-545(19) proposes to widen and reconstruct a portion of SR 17 in Franklin County. The project begins on SR 17 approx. 0.40 miles southeast of the northbound I-85 ramps. The proposed roadway consists of 4-12 ft. lanes divided by a 20 ft. raised median that extends for approx. 0.80 miles crossing I-85. The typical section then transitions to a 4-12 ft. lanes divided by a 14 ft. flush median that extends 0.70 miles. At this point, the typical section transitions again to 4-12 ft. lanes divided by a 44 ft. depressed grassed median that extends for approx. 2.44 miles to the project terminus approx. 4,100 ft. southeast of the Stephens County line. The existing bridge over I-85 has a sufficiency rating of 58.26 and will be replaced. The total length of this project is approximately 4.00 miles in length and this road improvement will be removing substandard curves and grades.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data