SR 172 @ COLDWATER CREEK 8.5 MI E OF ROYSTON
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project consists of replacing the structurally deficient bridge on SR 172 over Coldwater Creek in Hart County. The sufficiency rating of the existing bridge is 35.22 out of 100. The proposed bridge will stay on the same alignment as the existing bridge. Traffic will be maintained during construction on a temporary bridge to the east of the existing roadway.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of replacing the structurally deficient bridge on SR 172 over Coldwater Creek in Hart County. The sufficiency rating of the existing bridge is 35.22 out of 100. The proposed bridge will stay on the same alignment as the existing bridge. Traffic will be maintained during construction on a temporary bridge to the east of the existing roadway. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
