SR 178 WaterLine Relocation
Bidding · Mississippi · Last reported Jun 2024
Source: Dodge USA
The project consists of, but is not limited to, the following: Install 1,640 linear feet 8-inch diameter PVC potable waterline. Install/replace four (4) water service connections inclusive of water meters with valve box, copper service line and service tap to new waterline. Cut, plug and abandon "existing" waterline and remove "old" water meters and valve boxes. Install one (1) 8" tapping sleeve &
- Status
- Prospective
- Sector
- Metal, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Holly Springs, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SR 178 WaterLine Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of, but is not limited to, the following: Install 1,640 linear feet 8-inch diameter PVC potable waterline. Install/replace four (4) water service connections inclusive of water meters with valve box, copper service line and service tap to new waterline. Cut, plug and abandon "existing" waterline and remove "old" water meters and valve boxes. Install one (1) 8" tapping sleeve & valve (TS&V) Install two (2) 8" gate valves. Install five (5) fire hydrants and assemblies. Rest... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Holly Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
