logo

SR 17/SR 17 ALT FM CR 24/SCOTT ROAD TO CR 190/MEMORIAL DRIVE

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project begins at the intersection of CR 24/Scott Road and the existing SR 17. The roadway will be widened on the east side, holding the existing right-of-way on the west side, to create a four-lane divided roadway with a 44-foot depressed median. The road widening to the east will continue until just north of CR 195/Eastanollee Bypass. The beginning of the 55 mph design speed along with the

Project Information FAQ

Project Information

4 Q
The project “SR 17/SR 17 ALT FM CR 24/SCOTT ROAD TO CR 190/MEMORIAL DRIVE” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project begins at the intersection of CR 24/Scott Road and the existing SR 17. The roadway will be widened on the east side, holding the existing right-of-way on the west side, to create a four-lane divided roadway with a 44-foot depressed median. The road widening to the east will continue until just north of CR 195/Eastanollee Bypass. The beginning of the 55 mph design speed along with the 20-foot raised median section begins at the intersection of CR 198/Eastanollee Road. The alignment will then shift to the west side of SR 17 to avoid impacting two historical properties. At CR 194/Moore Circle, the alignment will then transition to widening symmetrically about existing SR 17. This alignment will flatten the curve at CR 191/Fieldcrest Road and then continue to the project terminus at CR 190/Memorial Drive. The total project length is 3.04 miles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data