SR-18 (Bluff Street) Upgrades
The owner, status and timeline of this project. A free account opens every field.
Source: UDOT (.gov)
Reconfiguring Bluff Street from St. George Boulevard to Main Street. Resurfacing the current road, repairing and building new drains and adding medians to reduce conflict points. This project is anticipated to begin in May and wrap up in the winter of 2028.
- Status
- Prospective
- Sector
- Road, Commercial
- Location
- St. George, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- UDOT (.gov)
ConstructChat
Ask ConstructChat about SR-18 (Bluff Street) Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconfiguring Bluff Street from St. George Boulevard to Main Street. Resurfacing the current road, repairing and building new drains and adding medians to reduce conflict points. This project is anticipated to begin in May and wrap up in the winter of 2028. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | St. George |
Source
Source | UDOT (.gov) |
URL |
More Details
Record type | Project |
Sector | Road, Commercial |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
