logo

SR-18 (Bluff Street) Upgrades

The owner, status and timeline of this project. A free account opens every field.

Source: UDOT (.gov)

Project
Planned

Reconfiguring Bluff Street from St. George Boulevard to Main Street. Resurfacing the current road, repairing and building new drains and adding medians to reduce conflict points. This project is anticipated to begin in May and wrap up in the winter of 2028.

Status
Prospective
Sector
Road, Commercial
Location
St. George, Utah, United States of America
Updated
22 Jul 2026
Source
UDOT (.gov)

ConstructChat

Ask ConstructChat about SR-18 (Bluff Street) Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR-18 (Bluff Street) Upgrades” is an infrastructure initiative in the Road sector, located in St. George, Utah, United States. Taiyo aggregates data on it from UDOT (.gov).

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Reconfiguring Bluff Street from St. George Boulevard to Main Street. Resurfacing the current road, repairing and building new drains and adding medians to reduce conflict points. This project is anticipated to begin in May and wrap up in the winter of 2028.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Utah

City

St. George

Source

Source

UDOT (.gov)

URL

More Details

Record type

Project

Sector

Road, Commercial

Article published date

2026-03-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project