logo

SR 18 SO/SR 41 SO; SR 109 & CS 799/DEPOT ST @ 3 LOCS - PH II

Sector: Road • Location: Greenville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

Greenville Downtown Sidewalks and Streetscape - Phase II:

  1. SR 18 South/SR 41 South from SR 41 to SR 41
  2. SR 109 from CS 782/Willams Street to SR 18/SR 41 South/Depot Street
  3. CS 799/South Depot Street from CS 783/College Street to SR 41 South/Courthouse Square This project includes improvements on Depot St (470 feet) and LaGrange St (225 feet). Also incuded in the facing a capping the

Project Information FAQ

Project Information

4 Q
The project “SR 18 SO/SR 41 SO; SR 109 & CS 799/DEPOT ST @ 3 LOCS - PH II” is an infrastructure initiative in the Road sector, located in Greenville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Greenville Downtown Sidewalks and Streetscape - Phase II: 1. SR 18 South/SR 41 South from SR 41 to SR 41 2. SR 109 from CS 782/Willams Street to SR 18/SR 41 South/Depot Street 3. CS 799/South Depot Street from CS 783/College Street to SR 41 South/Courthouse Square This project includes improvements on Depot St (470 feet) and LaGrange St (225 feet). Also incuded in the facing a capping the 770 foot retaining wall around Meriwether County Courthouse and striping a 6-foot wide walking area between the wall and parking spaces. The existing sidewalks will be removed and replaced with hexagon pavers. Where possible a grass strip will be maintained between the road and the sidewalk. Shallow retaining walls will be constructed as necessary for ADA accessibility. Curb and gutter will be replaced as needed. The existing parking areas will be restriped to accommodate changes required by new curb and gutter, walls and pedestrian walkway around the courthouse.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data