SR 1/US 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
Project NH-017-3(45) proposes to widen and reconstruct an existing portion of SR 1/ US 27 into a five-lane urban facility consisting of two 12-foot travel lanes in each direction and a 14-foot continuous center left-turn lane. The project begins approximately 250 feet south of North Fifth Avenue and continues north to John Davenport Drive. The current railroad overpass bridge would be replaced wi
- Status
- Closed
- Sector
- Bridge, Rail, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 1/US 27 IN ROME FM 5TH AVE TO JOHN DAVENPORT DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project NH-017-3(45) proposes to widen and reconstruct an existing portion of SR 1/ US 27 into a five-lane urban facility consisting of two 12-foot travel lanes in each direction and a 14-foot continuous center left-turn lane. The project begins approximately 250 feet south of North Fifth Avenue and continues north to John Davenport Drive. The current railroad overpass bridge would be replaced with a longer span bridge with a minimum clearance of 16.5 feet. Additionally, there would be approximately 2,130 feet of railroad track that would be relocated. The project will provide for greater horizontal and vertical clearance on the roadway and a safer, more efficient multi-lane facility along SR 1/ US 27 by increasing roadway capacity and correcting the level of service deficiencies. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail, Road, Government |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- TIBBS BR RD @ CONASAUGA RIVER/ALSO WHITFIELD CO
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- CR 623/HARDIN BR RD @ TWO RUN CRK (015-00623X-00972W)
