logo

SR-2 Bridge Repair Eastbound at LM 16.81

The status, timeline and source of this project. A free account opens every field.

Source: 3B Media News

Project
Under Construction

Bridge deck repair on SR-2 eastbound at LM 16.81 with lane closures from 8 PM to 3 AM on April 20, 2026. Traffic control will maintain flow with lane 1 and entrance lane to I-24 Westbound onramp open.

Status
Under Construction
Sector
Bridge, Road
Location
Tullahoma, Tennessee, United States of America
Updated
22 Jul 2026
Source
3B Media News

ConstructChat

Ask ConstructChat about SR-2 Bridge Repair Eastbound at LM 16.81

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR-2 Bridge Repair Eastbound at LM 16.81” is an infrastructure initiative in the Bridge sector, located in Tullahoma, Tennessee, United States. Taiyo aggregates data on it from 3B Media News.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge deck repair on SR-2 eastbound at LM 16.81 with lane closures from 8 PM to 3 AM on April 20, 2026. Traffic control will maintain flow with lane 1 and entrance lane to I-24 Westbound onramp open.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Tennessee

City

Tullahoma

Source

Source

3B Media News

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-04-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project