SR 20 @ CHATTAHOOCHEE RIVER @ FORSYTH CO LINE
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project will widen SR 20 from a 2-lane rural section to 4-lane divided urban roadway and will replace the SR 20 Bridge over the Chattahoochee River. The project begins in Forsyth County at Burgess Road and ends in Gwinnett County east of the Burnette Trail. The project has a total project length of 1.079 miles.
- Status
- Closed
- Sector
- Bridge, Road
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 20 @ CHATTAHOOCHEE RIVER @ FORSYTH CO LINE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will widen SR 20 from a 2-lane rural section to 4-lane divided urban roadway and will replace the SR 20 Bridge over the Chattahoochee River. The project begins in Forsyth County at Burgess Road and ends in Gwinnett County east of the Burnette Trail. The project has a total project length of 1.079 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
