logo

SR 20 CONN FROM GRASSDALE ROAD TO OLD GRASSDALE ROAD-PHASE I

Sector: Bridge • Location: Cartersville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project proposes to connect existing Grassdale Road with Old Grassdale Road east of I-75 within the limits of Bartow County. The corridor is a new location divided four-lane, limited access facility and is classified as a rural principal arterial. The I-75 interchange will require a bridge spanning I-75, with roundabouts at each of the ramp heads. An additional roundabout is proposed at the r

Project Information FAQ

Project Information

3 Q
The project “SR 20 CONN FROM GRASSDALE ROAD TO OLD GRASSDALE ROAD-PHASE I” is an infrastructure initiative in the Bridge sector, located in Cartersville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project proposes to connect existing Grassdale Road with Old Grassdale Road east of I-75 within the limits of Bartow County. The corridor is a new location divided four-lane, limited access facility and is classified as a rural principal arterial. The I-75 interchange will require a bridge spanning I-75, with roundabouts at each of the ramp heads. An additional roundabout is proposed at the realigned intersection with Busch Drive. The total length of the project is approximately 3.15 miles. This project was originally one of two projects that comprised the original PI-0013238 Rome Cartersville Development Corridor project. In September 2023, that project was split into two phases, with this project being designated as Phase I. The revised PI-0013238, with the new description, Rome-Cartersville Corr FM SR 3 to Grassdale Rd - Ph II, continued the corridor westward to tie to US 411 approximately 0.5 miles west of SR 3.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data