SR 20 CONN FROM GRASSDALE ROAD TO OLD GRASSDALE ROAD-PHASE I
Sector: Bridge • Location: Cartersville, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project proposes to connect existing Grassdale Road with Old Grassdale Road east of I-75 within the limits of Bartow County. The corridor is a new location divided four-lane, limited access facility and is classified as a rural principal arterial. The I-75 interchange will require a bridge spanning I-75, with roundabouts at each of the ramp heads. An additional roundabout is proposed at the r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction work program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project proposes to connect existing Grassdale Road with Old Grassdale Road east of I-75 within the limits of Bartow County. The corridor is a new location divided four-lane, limited access facility and is classified as a rural principal arterial. The I-75 interchange will require a bridge spanning I-75, with roundabouts at each of the ramp heads. An additional roundabout is proposed at the realigned intersection with Busch Drive. The total length of the project is approximately 3.15 miles. This project was originally one of two projects that comprised the original PI-0013238 Rome Cartersville Development Corridor project. In September 2023, that project was split into two phases, with this project being designated as Phase I. The revised PI-0013238, with the new description, Rome-Cartersville Corr FM SR 3 to Grassdale Rd - Ph II, continued the corridor westward to tie to US 411 approximately 0.5 miles west of SR 3. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
