logo

SR 20 FM 0.19 MI S OF CR 118/TUCK RD TO CS 507/COVINGTON ST

Sector: Road • Location: Loganville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project is located in Walton County within land lots 154, 186, 187, 188, 215, and 216 in Land District 4. The project begins approximately 1000 ft south of the existing intersection of CR 118/Tuck Road and SR 20 (MP 2.1) and ends at the intersection of SR 20 and Covington Street (MP 0.8) for a total project length of approximately 1.3 miles. The project lies completely within Walton

Project Information FAQ

Project Information

4 Q
The project “SR 20 FM 0.19 MI S OF CR 118/TUCK RD TO CS 507/COVINGTON ST” is an infrastructure initiative in the Road sector, located in Loganville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is located in Walton County within land lots 154, 186, 187, 188, 215, and 216 in Land District 4. The project begins approximately 1000 ft south of the existing intersection of CR 118/Tuck Road and SR 20 (MP 2.1) and ends at the intersection of SR 20 and Covington Street (MP 0.8) for a total project length of approximately 1.3 miles. The project lies completely within Walton County and completely within the City of Loganville. Along SR 20, the existing two-lane section will be widened to a four-lane section with a raised median that varies between 20-ft to 24-ft. CR 118/Tuck Road and CS 660/N Sharon Church Road will be realigned to intersect SR 20 with a multilane roundabout approximately 80 ft south of the existing intersection of CS 660/N Sharon Church Road and SR 20. The project construction time is estimated to last 24 months and will occur without the use of detours.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data