SR 201 @ TANYARD CREEK
Sector: Power Transmission • Location: Tunnel Hill, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project replaces the existing double barrel culvert on SR 201 over Tanyard Creek in Whitfield County. The project will utilize an off site detour and will have a construction duration of approximately 12 months.
- Status
- Closed
- Sector
- Power Transmission, Government, Power Generation (CCGT), Bridge, Tunnel
- Location
- Tunnel Hill, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 201 @ TANYARD CREEK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project replaces the existing double barrel culvert on SR 201 over Tanyard Creek in Whitfield County. The project will utilize an off site detour and will have a construction duration of approximately 12 months. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Tunnel Hill |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Government, Power Generation (CCGT), Bridge, Tunnel |
Article published date | 2024-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
