SR 204 FM E OF CR 68/PINE GROVE TO W OF CR 975/VETERANS PKWY
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
The proposed project would construct a grade separated interchange at the intersection of SR 204/Abercorn Street Extension and King George Boulevard (CR 71) in Chatham County. The project would begin just east of Pine Grove Road (CR 68) and end just west of Veterans Parkway (CR 975). The proposed project length is 1.46 miles. SR 204 would be grade separated over King George Boulevard. The prop
- Status
- Closed
- Sector
- Car parking, Cement, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 204 FM E OF CR 68/PINE GROVE TO W OF CR 975/VETERANS PKWY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project would construct a grade separated interchange at the intersection of SR 204/Abercorn Street Extension and King George Boulevard (CR 71) in Chatham County. The project would begin just east of Pine Grove Road (CR 68) and end just west of Veterans Parkway (CR 975). The proposed project length is 1.46 miles. SR 204 would be grade separated over King George Boulevard. The proposed project would maintain the four 12-foot lanes and a 20-foot median with concrete barrier. Outside shoulders would be 14-foot graded, 12-foot paved. Auxiliary lanes would be included in both directions along SR 204 between Veterans Parkway and the King George Boulevard interchange ramps. Traffic signals would be included on King George Boulevard at the eastbound ramps and at Mariners Way. Interchange lighting would be included in the project. Sidewalks and crosswalks will be constructed along King George Boulevard in compliance with Americans with Disabilities Act (ADA) requirements. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Cement, Road, Government, Automotive |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
