logo

SR 204 SPUR/DIAMOND CAUSEWAY @ SKIDAWAY NARROWS

Sector: Water Supply and Storage • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project will replace the existing 2-lane bascule bridge with a new 2-lane high level bridge over Skidaway Narrows. The new bridge will be constructed parallel to and north of the existing bridge within existing right-of-way. The proposed high-rise bridge will be 3,220 feet long and 38 feet wide including two 11-foot lanes with 8 foot shoulders. Bike lanes will be included on the 8-foot sho

Project Information FAQ

Project Information

4 Q
The project “SR 204 SPUR/DIAMOND CAUSEWAY @ SKIDAWAY NARROWS” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will replace the existing 2-lane bascule bridge with a new 2-lane high level bridge over Skidaway Narrows. The new bridge will be constructed parallel to and north of the existing bridge within existing right-of-way. The proposed high-rise bridge will be 3,220 feet long and 38 feet wide including two 11-foot lanes with 8 foot shoulders. Bike lanes will be included on the 8-foot shoulders. The minimum clearance over the navigable channel is proposed at 65 feet above mean high water (MHW). The removal of the existing bascule bridge will be included in this project. The length of the total project (bridge and approaches) will be approximately 1.25 miles. The future road widening and parallel companion bridge will be constructed on Project STP-00MS(4), P.I. #550550 SR 204 SPUR/Diamond Causeway widening.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data