SR 21 STREETSCAPE IMPROVEMENTS
Sector: Water Supply and Storage • Location: Springfield, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project consists improving North Laurel Street from 2nd Street to 1st Street as well as the intersection of Laurel Street and 2nd Street. All construction will be within the existing right-of-way and will be in accordance with the DOT Enhancement Program requirements. Features will include, but not limited to, sidewalkimprovements, low cover landscaping, irrigation, curb improvements,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project consists improving North Laurel Street from 2nd Street to 1st Street as well as the intersection of Laurel Street and 2nd Street. All construction will be within the existing right-of-way and will be in accordance with the DOT Enhancement Program requirements. Features will include, but not limited to, sidewalkimprovements, low cover landscaping, irrigation, curb improvements, accessible ramp improvements, pedestrian lighting, and a signalization upgrade at the 2nd and Laurel Street intersection. Any lighting that is located within 8-feet of the travel lane will have breakaway design for the bases. Posted and design speed limits for the roadway is 30 mph. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
