logo
ProjectConstruction Work Program

SR 211 @ CR 38/DEE KENNEDY ROAD

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

The proposed project is at the int of SR211 and CR138/Dee Kennedy Rd. The int is located in NW Barrow County approx 4.4 mi NW of the City of Winder, GA. This project proposes to replace the existing un-signalized int with a circular multi-lane roundabout config for a project length of 0.37 mi. The circular roundabout would consist of inscribed dia of 85ft major axis and 80ft minor axis. A 30ft cir

Status
Under Construction
Sector
Road, Car parking, Automotive, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 211 @ CR 38/DEE KENNEDY ROAD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 211 @ CR 38/DEE KENNEDY ROAD” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is at the int of SR211 and CR138/Dee Kennedy Rd. The int is located in NW Barrow County approx 4.4 mi NW of the City of Winder, GA. This project proposes to replace the existing un-signalized int with a circular multi-lane roundabout config for a project length of 0.37 mi. The circular roundabout would consist of inscribed dia of 85ft major axis and 80ft minor axis. A 30ft circ roadway width with a 18.4ft truck apron would be provided to accommodate turning movements. Curb and gutter would be installed along the outside of roundabout and on the inside of truck apron. The roadway approaches would consist of 12ft travel lanes and 10ft outside shoulders, of which 6.5ft would be paved with open ditch drainage. As the roadway approaches the roundabout, the typ section would transition to a divided roadway with variable width travel lanes and curb and gutter on the outside. 5ft sidewalks and crosswalks would be provided for pedestrians traveling through the intersection.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Car parking, Automotive, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project