logo

SR 211 @ CR 38/DEE KENNEDY ROAD

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project is at the int of SR211 and CR138/Dee Kennedy Rd. The int is located in NW Barrow County approx 4.4 mi NW of the City of Winder, GA. This project proposes to replace the existing un-signalized int with a circular multi-lane roundabout config for a project length of 0.37 mi. The circular roundabout would consist of inscribed dia of 85ft major axis and 80ft minor axis. A 30ft cir

Project Information FAQ

Project Information

4 Q
The project “SR 211 @ CR 38/DEE KENNEDY ROAD” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is at the int of SR211 and CR138/Dee Kennedy Rd. The int is located in NW Barrow County approx 4.4 mi NW of the City of Winder, GA. This project proposes to replace the existing un-signalized int with a circular multi-lane roundabout config for a project length of 0.37 mi. The circular roundabout would consist of inscribed dia of 85ft major axis and 80ft minor axis. A 30ft circ roadway width with a 18.4ft truck apron would be provided to accommodate turning movements. Curb and gutter would be installed along the outside of roundabout and on the inside of truck apron. The roadway approaches would consist of 12ft travel lanes and 10ft outside shoulders, of which 6.5ft would be paved with open ditch drainage. As the roadway approaches the roundabout, the typ section would transition to a divided roadway with variable width travel lanes and curb and gutter on the outside. 5ft sidewalks and crosswalks would be provided for pedestrians traveling through the intersection.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data