logo

SR-22 Access Improvements

Sector: Seaport • Location: California, United States of America (USA)

Source: Orange County Transportation Authority

Project
Closed

The Garden Grove Freeway (SR-22) is an integral part of Southern California’s freeway network. To address specific freeway and local street congestion at Brookhurst Street, Euclid Street and Harbor Boulevard, interchanges access improvements were included in Measure M2 (also known as OC Go). Utilizing savings from Measure M1 (20-year half cent sales tax for transportation improvements), these impr

Project Information FAQ

Project Information

5 Q
The project “SR-22 Access Improvements” is an infrastructure initiative in the Seaport sector, located in California, United States of America (USA). Taiyo aggregates data on it from Orange County Transportation Authority.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Garden Grove Freeway (SR-22) is an integral part of Southern California’s freeway network. To address specific freeway and local street congestion at Brookhurst Street, Euclid Street and Harbor Boulevard, interchanges access improvements were included in Measure M2 (also known as OC Go). Utilizing savings from Measure M1 (20-year half cent sales tax for transportation improvements), these improvements were expedited and funded as part of a larger bonus project, the SR-22 Improvement Project which added carpool lanes the entire length of the SR-22 freeway. The project reconstructed three OC Go SR-22 freeway interchanges at Euclid Street, Harbor Boulevard, and Brookhurst Street improving traffic flow on city streets. It also reduced back-up on the SR-22 freeway on- and off-ramps by adding additional ramp capacity that were needed and alleviating congestion at the interchanges. The project upgraded and modified signals and resurfaced the city street with improved striping and signage at the interchanges.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data