SR 22 (Wewa Highway) from US 98B to Star Avenue
Sector: Bridge • Location: Panama City, Callaway, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
The purpose and need of this study was to increase capacity of S.R. 22 (Wewa Highway) from US 98B to Star Avenue. Improvements to the corridor will assist in the movement of freight and goods, minimize travel times for the general public, and maintain Level of Service (LOS) standards through the Design Year (2040). This project is needed in order to increase roadway capacity for people and goods t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose and need of this study was to increase capacity of S.R. 22 (Wewa Highway) from US 98B to Star Avenue. Improvements to the corridor will assist in the movement of freight and goods, minimize travel times for the general public, and maintain Level of Service (LOS) standards through the Design Year (2040). This project is needed in order to increase roadway capacity for people and goods traveling on Wewa Highway through Bay County and the City of Callaway and the City of Springfield. Preferred “Build’ Concept: The Build scenario proposed to widen the roadway to a four-lane urban section, with curb and gutter, and a raised landscaped median. Bike lanes and sidewalks are also provided in each direction to accommodate the pedestrian users along the corridor. The four-lane section will include exclusive left-turn lanes located at major intersections and driveway connections, consistent with access class 5 (1/4 mile spacing for full opening and 1/8 mile spacing for directional openings) and a single-lane left-turn flyover from southbound Tyndall Parkway to eastbound Wewa Highway. Transportation System Management (TSM) Alternative strategies were considered and included in the analysis, but were not found to be prudent, viable solution. The analysis found that capacity improvements are needed for SR 22 in the future. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
