SR 22/US 80 @ 3 LOCS & SR 85/US 27 @ 1 LOC - BRIDGE REHAB
Sector: Consumer Products • Location: Columbus, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The work involves Bridge Culvert Rehabilitation at two (2) locations at Bull Creek and two (2)locations at Flat Rock Creek in Muscogee County. The work will consist of the following: epoxy injection and spall/abrasion repair culverts walls, seal construction joints, remove sediments and drifts, and remove vegetation within 20 feet of the structure.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work involves Bridge Culvert Rehabilitation at two (2) locations at Bull Creek and two (2)locations at Flat Rock Creek in Muscogee County. The work will consist of the following: epoxy injection and spall/abrasion repair culverts walls, seal construction joints, remove sediments and drifts, and remove vegetation within 20 feet of the structure. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
