logo

SR 23/US 25/US 301 @ SR 196

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed improvement of the intersection at SR 23/US 25/US 301 and SR 196 is located in southeast Tattnall County. The proposed intersection improvement is a single lane roundabout, including realignment of the intersection approaches which also includes the realignment of the approach of Baxter-Durrence Rd (CR 508) to SR 23/US 25/ US 301, south of the proposed roundabout, to reduce the skewed

Project Information FAQ

Project Information

4 Q
The project “SR 23/US 25/US 301 @ SR 196” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed improvement of the intersection at SR 23/US 25/US 301 and SR 196 is located in southeast Tattnall County. The proposed intersection improvement is a single lane roundabout, including realignment of the intersection approaches which also includes the realignment of the approach of Baxter-Durrence Rd (CR 508) to SR 23/US 25/ US 301, south of the proposed roundabout, to reduce the skewed approach angle of this intersection. The proposed roundabout configuration would include a 70 feet diameter central landscaped island, a 33 feet wide truck apron, and a 22 feet wide travel lane with urban shoulders. The shoulders will consist of 30 inch curb and gutter, a four feet wide grassed area adjacent to the back of curb and additional truck apron along the outside shoulder, drained by curb and gutter, inlets, and storm drains.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data