SR 24 FROM SR 16 TO N OF EAST HARRIS ST/WILLIE BAILEY ST
Sector: Water Supply and Storage • Location: Eatonton, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Eatonton Downtown Streetscape - Phase I:
- North Jefferson Ave from SR 16 to Willie Bailey St.
- East Marion St from North Jefferson Ave to parking lot entry behind buildings on N Jefferson Ave.
The project will include the demolition of the existing sidewalk, curb & gutter and drainage inlets. The curb & gutter will be replaced with 1200 LF of 8" concrete curb & gutter to help decrease t
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Commercial, Car parking, Automotive, Government, Waste Processing and Treatment
- Location
- Eatonton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 24 FROM SR 16 TO N OF EAST HARRIS ST/WILLIE BAILEY ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eatonton Downtown Streetscape - Phase I: 1. North Jefferson Ave from SR 16 to Willie Bailey St. 2. East Marion St from North Jefferson Ave to parking lot entry behind buildings on N Jefferson Ave. The project will include the demolition of the existing sidewalk, curb & gutter and drainage inlets. The curb & gutter will be replaced with 1200 LF of 8" concrete curb & gutter to help decrease the elevation difference between the existing doorways and the top of the curb. The existing sidewalk will be replaced with 1500 SY of new 4” thick concrete sidewalk and 3000 SF of brick pavers in a decorative border. The brick pavers will also be used at intersection corners. 900 SF of brick pavers will also be used in the crosswalk. The corners of N. Jefferson Ave and Marion St will be framed with bulb-outs, which will allow streetscape planting and accommodate handicap access on non-ADA corners. The landscaped islands will be irrigated and an indemnity agreement will be required. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Eatonton |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Commercial, Car parking, Automotive, Government, Waste Processing and Treatment |
Article published date | 2025-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
