SR 247 AT BOOTH ROAD/CS 567 INTER. IMPROVEMENT
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
This project consists of widening Russell Parkway, east bound exit ramp, to provide two left turn lanes and one right turn lane. A signal light is being added at the intersection. In addition, a right turn lane is being added to S.R. 247/ US 129 onto Booth Road.
PURPOSE: Accident history for this intersection shows six accidents in 1998 and six accidents in 1999. Two of these were right-ang
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 247 AT BOOTH ROAD/CS 567 INTER. IMPROVEMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of widening Russell Parkway, east bound exit ramp, to provide two left turn lanes and one right turn lane. A signal light is being added at the intersection. In addition, a right turn lane is being added to S.R. 247/ US 129 onto Booth Road. PURPOSE: Accident history for this intersection shows six accidents in 1998 and six accidents in 1999. Two of these were right-angle accidents, five were rear-end accidents in the SR 247 median, four occurred south bound on-ramp area, and one was a rear-end accident on east bound ramp. The installation of a traffic signal and the removal of the long southbound ramp will greatly enhance the safety of this intersection. To improve the safety and orderly progression of traffic through the intersection, these improvements are recommended. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
