SR 24/US 129 FROM N OF APALACHEE RIVER TO CS 7/ASTONDALE RD
Sector: Road • Location: Bishop, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Widen and reconstruct US441/SR 24 from just north of the Apalachee River to CS 7/Astondale Road in Oconee County. The proposed typical section is 4-12' travel lanes with a 24' raised median. The approved project limits are all on the existing alignment of US 441. The overall project length is now 6.25 mile and has a design speed of 55 mph.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction work program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Widen and reconstruct US441/SR 24 from just north of the Apalachee River to CS 7/Astondale Road in Oconee County. The proposed typical section is 4-12' travel lanes with a 24' raised median. The approved project limits are all on the existing alignment of US 441. The overall project length is now 6.25 mile and has a design speed of 55 mph. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
