logo

SR 24/US 441 FROM EATONTON BYPASS TO MORGAN COUNTY LINE

Sector: Road • Location: Eatonton, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The Project proposes to widen the existing US 441/SR 24 roadway from 2 & 3 lanes to 4 lanes with a 32 foot grassed median. It begins by tying to the northern termini of the Eatonton Bypass, widening to the east of the existing US 441/SR 24 roadway. This concept continues to north of CR 177/Glenwood Dr., where the concept shifts to hold the existing right-of-way in order to avoid impacting an histo

Project Information FAQ

Project Information

4 Q
The project “SR 24/US 441 FROM EATONTON BYPASS TO MORGAN COUNTY LINE” is an infrastructure initiative in the Road sector, located in Eatonton, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project proposes to widen the existing US 441/SR 24 roadway from 2 & 3 lanes to 4 lanes with a 32 foot grassed median. It begins by tying to the northern termini of the Eatonton Bypass, widening to the east of the existing US 441/SR 24 roadway. This concept continues to north of CR 177/Glenwood Dr., where the concept shifts to hold the existing right-of-way in order to avoid impacting an historical site to the west of US 441/SR 24. This concept continues to the Putnam-Morgan County line, where the project ends by tying to the southern terminus of project EDS-441(44). The total project length is 9.2 miles. Proposed right-of-way varies from approximately 250 to 360 feet.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data