logo

SR 25 @ MIDDLE RIVER IN PORT WENTWORTH

Sector: Bridge • Location: Port Wentworth, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The bridge on SR 25 over Middle River, Structure ID 051-0055-0, was built in 1922 and widened in 1953. The bridge consists of 69 spans of Reinforced Concrete Deck Girders (RCDG’s) on concrete caps with concrete piles and columns. This bridge was designed using an HS-15 vehicle, which is below current design standards. The overall condition of this bridge would be classified as fair. This bridge is

Project Information FAQ

Project Information

4 Q
The project “SR 25 @ MIDDLE RIVER IN PORT WENTWORTH” is an infrastructure initiative in the Bridge sector, located in Port Wentworth, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The bridge on SR 25 over Middle River, Structure ID 051-0055-0, was built in 1922 and widened in 1953. The bridge consists of 69 spans of Reinforced Concrete Deck Girders (RCDG’s) on concrete caps with concrete piles and columns. This bridge was designed using an HS-15 vehicle, which is below current design standards. The overall condition of this bridge would be classified as fair. This bridge is classified as having an unknown foundation and therefore could be at risk for scour. There are signs of differential settlement at several bent locations and estimated up to 2 inches at Bent 7. Due to the age of the structure, the structural integrity of the bridge pertaining to the design vehicle, the numerous spalls with exposed reinforcing steel throughout the structure, and the unknown foundation and differential settlement of the substructure, replacement of this 94-year old bridge is recommended.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data