logo

SR 25 FM CR 372/YACHT RD TO CR 415/HARRY DRIGGERS BLVD-PH I

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The proposed extends 4-lane section of SR 25/US 17 from CR 372/Yacht Drive (MP 17.92) to (MP 21.60) SR 25/CR 415/Harry Driggers Boulevard in Glynn Co. This section is currently a 2-lane section. The project includes widening SR 25/US 17 from 2-lanes to 4 - 12' travel lanes (2 in each direction) with a 24' raised median & 10-foot rural outside shoulders (6.5 feet paved). The paved outside shoulders

Status
Under Construction
Sector
Bridge, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 25 FM CR 372/YACHT RD TO CR 415/HARRY DRIGGERS BLVD-PH I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 25 FM CR 372/YACHT RD TO CR 415/HARRY DRIGGERS BLVD-PH I” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed extends 4-lane section of SR 25/US 17 from CR 372/Yacht Drive (MP 17.92) to (MP 21.60) SR 25/CR 415/Harry Driggers Boulevard in Glynn Co. This section is currently a 2-lane section. The project includes widening SR 25/US 17 from 2-lanes to 4 - 12' travel lanes (2 in each direction) with a 24' raised median & 10-foot rural outside shoulders (6.5 feet paved). The paved outside shoulders will accommodate the designated state bike route. Auxiliary turn lanes will be provided at public intersecting streets & median openings. There are 12 proposed median openings. The District 5 Traffic Engineering Study didn't support any signalization warrants. There is 1 bridge replacement to construct a new bridge at Thornhill Creek at approximately MP 19.08. The widening will be to the west side of SR 25. The design speed is 55 mph.The proposed project length would be approximately 4.0 miles.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Government

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project