SR-25 Sidewalk Improvement REBID
Sector: Cement • Location: Montevallo, Alabama, United States of America
Source: Dodge USA
THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS: 833 CU YD 210A000 UNCLASSIFIED EXCAVATION 261 CU YD 210D-001 BORROW EXCAVATION LOOSE TRUCKBED MEASUREMENT 1212 SQ YD 618A000 CONCRETE SIDEWALK, 4 THICK 475 SQ YD 618B003 CONCRETE DRIVEWAY, 6 THICK INCLUDES WIRE MESH 315 LIN FT 623B000 CONCRETE CURB, TYPE N 916 LIN FT 623C003 COMBINATION CURB AND GUTTER, TYPE C MODIFIED 1 L.S. 730C000 FURNIS
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Commercial
- Location
- Montevallo, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SR-25 Sidewalk Improvement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | THE PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS: 833 CU YD 210A000 UNCLASSIFIED EXCAVATION 261 CU YD 210D-001 BORROW EXCAVATION LOOSE TRUCKBED MEASUREMENT 1212 SQ YD 618A000 CONCRETE SIDEWALK, 4 THICK 475 SQ YD 618B003 CONCRETE DRIVEWAY, 6 THICK INCLUDES WIRE MESH 315 LIN FT 623B000 CONCRETE CURB, TYPE N 916 LIN FT 623C003 COMBINATION CURB AND GUTTER, TYPE C MODIFIED 1 L.S. 730C000 FURNISHING AND INSTALLING TRAFFIC CONTROL UNIT 1 L.S. 730Y620 FURNISHING AND INSTALLING PEDASTAL POLE A... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Montevallo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
