logo
ProjectConstruction Work Program

SR 26 @ LOTTS CREEK

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

Georgia Department of Transportation (GDOT) Project PI No. 0017928 would replace the existing bridge (Structure ID 031-0006-0) on SR 26/US 80 over Lotts Creek approximately 13.5 miles northwest of of Statesboro in Bulloch County, Georgia. The existing bridge over the Lotts Creek is approximately 180 feet long and 34.4 feet wide, with two 12-foot travel lanes and 2-foot shoulders. The existing rig

Status
Under Construction
Sector
Road, Bridge, Government, Manufacturing (Industrial)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 26 @ LOTTS CREEK

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 26 @ LOTTS CREEK” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Georgia Department of Transportation (GDOT) Project PI No. 0017928 would replace the existing bridge (Structure ID 031-0006-0) on SR 26/US 80 over Lotts Creek approximately 13.5 miles northwest of of Statesboro in Bulloch County, Georgia. The existing bridge over the Lotts Creek is approximately 180 feet long and 34.4 feet wide, with two 12-foot travel lanes and 2-foot shoulders. The existing right-of-way (ROW) width is approximately 100 feet. The proposed ROW width and project length have not yet been determined, though additional ROW acquisition is anticipated. A temporary on-site detour will be installed on the one side of the bridge to facilitate traffic flow while the existing bridge is removed, and the new bridge is installed.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge, Government, Manufacturing (Industrial)

Article published date

2025-08-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project