logo

SR 26 FROM CS 809/14TH ST TO CS 804/TYBRISIA ST

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project proposes the placement of a 4' raised median along portions of the centerline of the existing roadway. The project is located on SR 26/US 80 between 14th Street and Tybrisa Avenue on Tybee Island. The median would be planted with palm trees and native grasses. Median breaks will be located to provide continued access to the businesses and city streets/alleys. The roadway travel and

Project Information FAQ

Project Information

4 Q
The project “SR 26 FROM CS 809/14TH ST TO CS 804/TYBRISIA ST” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project proposes the placement of a 4' raised median along portions of the centerline of the existing roadway. The project is located on SR 26/US 80 between 14th Street and Tybrisa Avenue on Tybee Island. The median would be planted with palm trees and native grasses. Median breaks will be located to provide continued access to the businesses and city streets/alleys. The roadway travel and parking lanes would be restriped, certain existing unused driveways closed, and brick pavers installed in lieu of the existing 2' wide grass strip between existing curb and sidewalk. The total length of the project is 1200'. This project would restore the historic look of Tybee to the area, provide pedestrian refuge for those crossing the street, and extend the aesthetics of earlier projects into the corridor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data