SR 263 Capital Circle Multi-Lane Reconstruction
Sector: Bridge • Location: Tallahassee, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
The intent of these projects is to widen the existing roadway from two lanes to six lanes, add lighting and construct stormwater management facilities and intersection improvements. A 10-foot multi-use path will be constructed on the east side of the roadway and a 5-foot sidewalk will be constructed on the west side of both projects. A new bridge will be constructed over Munson Slough in Segment 1
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The intent of these projects is to widen the existing roadway from two lanes to six lanes, add lighting and construct stormwater management facilities and intersection improvements. A 10-foot multi-use path will be constructed on the east side of the roadway and a 5-foot sidewalk will be constructed on the west side of both projects. A new bridge will be constructed over Munson Slough in Segment 1 from Crawfordville Road to Springhill Road. Noise barrier walls are included as part of the design of this segment which is funded for right-of-way acquisition and construction. Bids for construction will be received fall 2021. Segment 2, from Springhill Road to Orange Avenue is funded for right-of-way acquisition and construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States Of America (USA)
- Doyle Carlton Dr & Laurel St Intersection Improvements
- Gandy Park South and A. J. Palonis Park Improvements
- Brorein St Bridge ( 105501) Phase 1 Structural Rehabilitation
- Causeway Blvd Water Distribution System Improvement Project
- US 231 south of Pipeline Road to north of Penny Road
- US 98 (15th Street) Resurfacing Project
- US 98 “Around the Mound” PD&E Study
- SR 388 from SR 79 to Northwest Florida Beaches International Airport
