logo

SR 284 @ CHATTAHOOCHEE RVR/LAKE LANIER 4 MI N OF GAINESVILLE

Sector: Commercial • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project consists of the bridge replacement at SR 284 over the Chattahoochee River, located 4 miles north of the city of Gainesville in Hall County. The proposed project length is 2986 feet (0.566 miles), beginning at M.P. 1.57 and extending to M.P. 2.13. The project proposes to build the proposed bridge 50 feet east (up river) of the existing bridge. The roadway typical section consists o

Project Information FAQ

Project Information

4 Q
The project “SR 284 @ CHATTAHOOCHEE RVR/LAKE LANIER 4 MI N OF GAINESVILLE” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the bridge replacement at SR 284 over the Chattahoochee River, located 4 miles north of the city of Gainesville in Hall County. The proposed project length is 2986 feet (0.566 miles), beginning at M.P. 1.57 and extending to M.P. 2.13. The project proposes to build the proposed bridge 50 feet east (up river) of the existing bridge. The roadway typical section consists of two 12 foot travel lanes and 10 foot rural shoulders, with 6.5 feet paved. The brdige typical section consists of two 12 foot lanes and 8 foot shoulders. The shoulders will be bikeable. A 10 foot x 8 foot pedestrian culvert will be constructed at the entrance of Clarks Bridge Park. Traffic will be maintained on the existing bridge during construction except during construction of the pedestrian culvert when an off-site detour will be used for 60 days maximum. Water main relocations are included for the City of Gainesville.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data